Betko fabricated and installed the stainless steel rails and cables, along with the structural steel guide rail supports. Additional column and beam supports were provided for both the elevator and the bridge. The scope also included the installation of metal decking, metal studs, an elevator pit ladder, and an elevator hoist beam.