Betko fabricated and installed four 30-foot, 2,300-pound (HSS 20x4x½” x 27’-5”) header beam supports on the 35th floor. Additionally, our team installed Corten steel planters at Shoreline’s entryway and removed, then reinstalled, two 50-foot transformer support beams.